At the front of the house, our host watches Charlie McGongagle put up a permanent drain pipe, while John Silva installs a new storm door. In the master bedroom, our master carpenter is busy trimming the windows, while Mary-Van is painting window sashes. In the basement, our host watches as Tom Silva levels the basement floor where the washer and dryer will be located using a plaster based compound. Tile is set in the upstairs bath.